MRO (Maintenance, Repair, Overhaul)

MRO (Maintenance, Repair, Overhaul): Services
MRO (Maintenance, Repair, Overhaul): Welcome

Our References-MRO Projects

MRO (Maintenance, Repair, Overhaul): List

ENGINES

2021-Ongoing: Warranty Support and After Sales Service for MAN Diesel High Speed Engines for 13 units KTMB’s Multiple Diesel Unit (DMU) Trains

TRAIN

2017-2019 : Overhaul, Testing and Commissioning of 20 units of Power Generating Cars for KTMB

WELDING

2018 : Welding works services for Railtech one-shot crucibles for 2x1000MW Coal Fire Power Plant Project in Port Dickson for Tenaga Nasional Berhad/Hyundai Engineering
2016 : Welding works services for Kelana Jaya Extension Line Project for Coals Rail
2015-2016 : Welding works services for Kajang-Sungai Buloh Depot Line for KVMRT Line 1 for MRT Corp
2008 : Thermit rail welding and de-stressing works for KTMB Electrified Double Track Project between Sentul and Batu Caves for YTL
2005 : Thermit rail welding and de-stressing works for KTMB Rawang, Kuala Lumpur and Port Klang Tracks for KTMB

COUPLER

2017 : Supply, Delivery and Training of Dellner Semi Permanent Coupler Floating Spare Parts for ETS 91 Class Component for MOT
2016 : Overhaul of Dellner Semi Permanent Coupler for 5 sets of ETS cars for KTMB

WHEEL LATHE

2016 : Maintenance of Hegenscheidt Underfloor Wheel Lathe Machine for Prasarana
2015 : Repair, Testing and Commissioning of Hegenscheidt Underfloor Wheel Lathe at KTMB EMU Maintenance Sentul Depot.

BRAKES

2022: Warranty Supportive Works for Knorr-Bremse Braking Systems component of LRT 3 22 x 3 Car Sets

2019-Ongoing : Warranty Supportive Works for Knorr-Bremse Braking Systems component of KTMB Nine (9) units of Electric Train-Sets 2 (ETS 2) project

2019-Ongoing : Warranty Supportive Works for Knorr-Bremse Braking Systems component of KTMB Thirteen (13) units of Diesel Multiple Units (DMUs) project

2012-2019 : Warranty Supportive Works for Knorr-Bremse Braking Systems component of KTMB Six Car Sets (SCS) 38 Sets x 6 Cars
2012-2019 : Warranty Supportive Works for Braking Systems component of Ampang New LRV 50 Sets x 6 Cars
2008 : Conversion Project of Vacuum and Dual Brake System to Air Brake System for KTMB’s Wagons
2008 : Setting up of a Brake Service and Maintenance Centre for KTMB
2007 : Overhaul of Knorr-Bremse Distributor Valve for KTMB

HVAC

2014-Ongoing : Warranty Support Works for HVAC system for KVMRT Line 1, 58 x 4 car set for MRT Corp

POWER


INTERIOR

2021- 2022: APS Capacitor Exchange MRO Service for Siemens on KVMRT 1 trains



2021- Ongoing: Train Interior Floor repairing MRO Service for Siemens on 58 trainsets for KVMRT 1 trains